|
Required procedures: |
|
1. |
The establishment should apply for Conformity Mark to EOS. |
| 2. |
A visit should be paid to the establishment to study its potentialities and the manufacture of the prototype . |
|
3. |
Conducting the tests and inspections on the prototype according to the relevant Egyptian standards and assessing the test results. |
|
4. |
Notifying the establishment as soon as finalizing the tests and inspections. |
|
|
A. |
In case of conformity, the establishment is notified to start the production process according to the prototype while keeping it in the establishment so as to refer to it in case of necessity . |
|
|
B. |
In case of nonconformity, the establishment is notified with the reasons to avoid it and provide a new prototype to be retested. |
|
5. |
The establishment should submit an application for inspecting the production batch and obtaining the conformity marks. |
|
6. |
Testing and inspecting the production batch according to the prototype and issuing inspecting records . |
|
|